Any state agency may enter into an energy performance-based contract with an energy performance contractor to significantly reduce energy costs of a state facility through one or more energy conservation or operational efficiency measures.
An Energy Savings Performance Contract (ESPC) is an agreement between a contractor, most often an energy services company, or ESCO, and a customer to perform as a condition of payment. Performance in this context means meeting a guaranteed level of energy savings.
Click HERE for detailed overview
ESCOs are essentially design-build general contractors combined with a diagnostic front end and a guaranteed-savings back end. They should provide, by some combination of in-house staff and subcontracts, all the labor, materials, equipment, and subcontractor management. If they do that well, they need little supervision. That being said, Virginia Energy can serve as an experienced and trusted third-party advisor to state agencies and local governments considering entering into an ESPC.
Energy Performance Contracting (ESPC) is primarily equipment replacement to provide energy savings and installation of building control systems to control energy consumption, which are defined as maintenance projects. They are impacted by the Virginia Uniform Statewide Building Code. State agencies shall comply with the Construction and Professional Services Manual (CPSM) for all design and construction work under this contract. Other public bodies must comply with their local building codes.
Case Studies and Success Stories:
Important Links
ESPC Forms and Documents
- Performance Contracting Fact Sheet
- A.EPC Timeline Instructions
- B. RFQ REQUEST
- C. ESCO POC list
- D. ESPC RFQ Evaluation Matrix
- E. BOE Kickoff Meeting Invitation
- F. BOE Kickoff Meeting Agenda
- G. BOE Kickoff Meeting Sign-In Sheet
- H. RFP for BOE Form
- I. Attachment C - Facility Listing Spread sheet
- J. BOE Facility Info (for IGA)
- Attachment A - ESCO Performance detail form
- Attachment B - ESCO Energy Conservation Measure Detail Form
- K. RFP for BOE ESCO Scoring Criteria
- L. ESCO In-Person BOE Presentation scoring criteria
- M. Follow up questions
- N. MOU Template
- O. Energy Special Terms and Conditions
- CO7-DB General Conditions of the Design Build Contract
- P. Supplemental General Conditions for Energy Service Company (ESCO) Contracts
- CO9-ESCO Contract Between Owner and Energy Performance Contractor
- Q. SAMPLE EPC Construction Contract for Public Bodies
- R. TRS Energy Financing Description (State Agencies)
- S. TRS Energy Financing Request Certificate (State Agencies)
- T. TRS Energy Acceptance Certificate (State Agencies)
- U. High Risk Contract Review Request Secured (State Agencies)
- V. CO-10 Standard Performance Bond
- W. CO-10.1 Standard Labor and Material Payment Bond
General Information
Step 1: Request for Qualifications (RFQ) Phase
Step 2: Request for Back of the Envelope (BOE) Phase
Step 3: Contract Phase
Miscellaneous Documents